A nationwide electrical, low-voltage, and IT services contractor with $300M–$450M in revenue, supporting:
Their work is a mix of:
Both require precise logistics, consistent vendor management, and fast turnaround.
Despite having procurement staff and internal “tools,” the company struggled with issues that plague nearly every contractor in this vertical.
Short-duration installs and long-duration projects were tracked through:
This caused:
For a contractor spending over $10M/year on rentals, this leakage alone could reach 10–30%.
A major issue for this vertical:
Crews book something for a 1–2 day install… and get billed differently than expected.
This happened because:
What should have been a $300 rental became a $700+ final bill, repeated hundreds of times per quarter.
SiteStack eliminates this.
Even with national agreements, the field still:
This generated massive inconsistency across programs.
On 12–18 month remodels or ground-ups, each job might require:
Over long durations, equipment frequently drifted:
Their spreadsheet-based tracking couldn’t keep up.
Leadership lacked visibility into:
A $10M+ rental program ran without real-time intelligence.
SiteStack gave the contractor a unified logistics and procurement system engineered for high-volume, multi-site electrical and low-voltage work.
Whether it was:
All rental requests now flowed through one standardized workflow.
.
SiteStack automatically recommended the right vendor based on:
This eliminated branch-to-branch inconsistencies and brought rate-card compliance to the field.
Teams could finally see:
Leakage disappeared from the system.
For short-turn work:
For large projects:
If a preferred vendor lacked availability, SiteStack surfaced additional supply from a network of 14,000+ locations, ensuring productivity never stalled.
Savings came from:
No more regional variability or field-level guesswork.
Leadership gained a real-time operational view across:
Ready to get started? Speak to sales about how SiteStack can benefit your business.